Renovation of the King's Gate

Renovations at the King's Gate 2/2021-5/2021 The planning of the renovation started in early February with the aim of making the floor similar to the one it had been until 2008. The team was assembled and work started on 18.2.2021 The renovation started with the demolition of the bakery side and the old line, then moved on to the kitchen. The kitchen was rearranged and the ventilation system was modified. Renovation of the hall Read more...